Project Case Study

Total Month Work Hours: 5,200 | Total Month Work
Cumulative Work Hours: 17,500 | Cumulative Work Hours
Average Staff On Site: 25 | Average Staff On Site
Hours Worked Without RIDDOR Reportable incident: 17,620 | Hours Worked Without RIDDOR Reportable incident

Gatwick Airport Drainage Rehabilitation Project.

Colas Airfields - Health & Safety Manager

Gatwick Airport

Scope

Key to the success of this project was delivering the rehabilitation works to the runway whilst maintaining Gatwick’s demanding flight schedule. Runway possessions were granted six nights a week (Mon-Sat) from 21.30pm to exactly 05.30am every morning.

The runway covers an impressive 400,000m² - the equivalent of 100 football pitches. This required over 50,000 tonnes of Marshall asphalt to resurface. All surfacing materials were batched on site. Each night shift planed and re-surfaced approximately 120 linear metres of the runway whilst works progressed to renew the aeronautical ground lighting’s 38km of duct and pit systems. Over 1,900 runway and taxiway lights were fitted and fed by 530km of new electrical cabling.

While the runway rehabilitation was being undertaken, it provided an opportunity for other improvements to be delivered at the same time. This included the enhancement of the existing runway guard bar system and an upgrade of the runway’s drainage system with four new attenuation tanks.

Our delivery teams embraced Gatwick Airport’s ‘Destination Zero’ philosophy, complementing our own ‘Incident & Injury Free (IIF)’ behavioural change programme. This project successfully contributed over 462,081 hours to Gatwick’s impressive 2.3 million hours of RIDDOR free working.

Derek Hendry, construction director at Gatwick Airport said: “VolkerFitzpatrick has worked closely with the Gatwick teams throughout the planning, design and construction stages to deliver a solution that met both our technical brief and protected aircraft operations They worked with us to overcome the challenges of the extremely unseasonal weather conditions in 2012, taking a proactive approach to re-engineering the design and re-sequencing the works. This enabled us to meet our critical objective of completing the runway resurfacing and return of the runway lighting system by 1 October 2013 ”

Ready to work with us

Get Started to working with us Lorem ipsum dolor sit amet consectetur adipisicing elit sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo abo.consectetur adipisicing elit sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam quis nostrud exercitaLorem ipsum dolor sit amet 